| Software estimation: a fuzzy approach |
| Full text |
Pdf
(343 KB)
|
| Source
|
ACM SIGSOFT Software Engineering Notes
archive
Volume 31 , Issue 3 (May 2006)
table of contents
SECTION: Article abstracts with full text online
table of contents
Pages: 1 - 5
Year of Publication: 2006
ISSN:0163-5948
|
|
Authors
|
|
| Publisher |
|
| Bibliometrics |
Downloads (6 Weeks): 10, Downloads (12 Months): 186, Citation Count: 0
|
|
|
ABSTRACT
Software projects are failing because of the poor project planning and due to this estimation have gained interest in recent times. Estimation process reduces the risk around schedule and cost. Effective software project estimation is one of the most challenging activities in software development that software industries are facing. Proper project planning and control is not possible without a reliable estimate. Top down and bottom up are traditionally the most commonly used techniques to estimate the effort of the software project. Studies suggest that the software companies should use Bottom up approach unless they have a vast experience from the similar projects. The goal of this research work is to extend the existing bottom up approach to achieve greater precision in the estimates. This work proposes the use and concepts of fuzzy set theory to extend the Bottom up approach to Fuzzy bottom up approach. With the productivity rate generated by fuzzy bottom up, derived values such as effort of development can be more precisely determined.
REFERENCES
Note: OCR errors may be found in this Reference List extracted from the full text article. ACM has opted to expose the complete List rather than only correct and linked references.
 |
1
|
|
| |
2
|
Internal Document on Methodologies https://www.accenture.com.
|
| |
3
|
|
| |
4
|
Jorgensen M, "Top Down and Bottom up expert estimation of software development effort", Information and Software Technology, vol. 46, no. 1, pp. 3--16, 2004.
|
| |
5
|
|
| |
6
|
Peters K, "Software Project Estimation", Software Productivity Center Inc 1999.
|
| |
7
|
Fuzzy Set Theory http://www.mathworks.com/access/helpdesk/help/toolbox/fuzzy/bp78170-1.html
|
| |
8
|
Lima O. D. S, Farias P. P. M and Belchio A. D, "A Fuzzy Model for Function Point Analysis to Development and Enhancement Project Assessments", Special Issue of Best Papers presented at CLEI'2001 January 2002 Volume 5:Number 2.
|
| |
9
|
Crespo, J., Sicilia, M. A, García, E., Cuadrado J. J, "On Aggregating Second-Level Software Estimation Cost Drivers: A Usability Cost Estimation Case Study", Information Processing and Management of Uncertainty in Knowledge-Based Systems IPMU 2004, 1255--1260, Perugia Italia.
|
| |
10
|
Jorgensen M, "A systematic review of Software Development and cost estimation Studies", Simula Research Laboratory, Martin Shepperd, Brunel University.
|
| |
11
|
|
| |
12
|
Agarwal R, Banerjee S and Gosh B, "Estimating Internet Based Project: A Case Study", in the International Internet & Software Quality week 2001 (QW2001), San Francisco, California, USA, May 29-June 1, 2001.
|
| |
13
|
Bruno G, Agarwal R, "Modeling the Enterprise Engineering Environment", IEEE Transactions on Engineering Management, 44, 1, pages 20--30, February 1997.
|
| |
14
|
|
|