Cited By
View all- Rossetti MXiang YYücesan E(2010)Simulating backlog and load building processes in a two-echelon inventory systemProceedings of the Winter Simulation Conference10.5555/2433508.2433736(1833-1845)Online publication date: 5-Dec-2010
- Jain SJefferson TFowler JIngalls R(2008)Tradeoffs in building a generic supply chain simulation capabilityProceedings of the 40th Conference on Winter Simulation10.5555/1516744.1517071(1873-1881)Online publication date: 7-Dec-2008