skip to main content
10.5555/1218112.1218445acmconferencesArticle/Chapter ViewAbstractPublication PageswscConference Proceedingsconference-collections
Article

A full factory transient simulation model for the analysis of expected performance in a transition period

Published: 03 December 2006 Publication History

Abstract

Intel's Fab-18 is based in Israel, and has transitioned from producing 0.18-micron logic devices to producing 90nM flash products. During this transition period, the factory has de-ramped in volume of logic while ramping-up flash. AutoSched AP software was utilized for the development of a transient simulation model of the Fab's behavior during this period. It is the first attempt, at Intel, to utilize a full factory simulation in order to analyze and support decisions that pertain to a transient period of parallel de-ramp and ramp-up of technologies. Unlike typical simulation models for the analysis of factory performance and behavior in steady-state, the transient model poses several modeling challenges and requires major adjustments in dealing with these challenges. In this paper, we discuss those aspects. The benefits and contribution of such a model to decision making and the improvement of factory performance are also presented.

References

[1]
Allen, D. E., A. Kalir, and K. G. Kempf, 1999, Refinement of Semiconductor Fab Capacity Planning through Dynamic Simulation, Proceedings of the Winter Simulation Conference 1999, Dec 5--8, Phoenix, Arizona, USA.
[2]
DeJong, C. D., and S. Fischbein, 2000, Integrating Dynamic Fab Capacity and Automation Models for 300mm Semiconductor Manufacturing, Proceedings of the Winter Simulation Conference 2000, Dec 10--13, pp. 1505--1509, Orlando, FL, USA.
[3]
Kalir, A., and O. Avidan, 2001, On the Uses of Simulation in the Planning and Ramp Phases of a High Volume Manufacturing Fab, Semiconductor Manufacturing Operational Modeling and Simulation (SMOMS) Conf., pp. 37--41, Seattle, WA, USA.
[4]
Dummler, M. 2000. Analysis of the Instationary Behavior of a Wafer Fab During Product Mix Changes. Proceedings of the Winter Simulation Conference, 1436--1442.

Cited By

View all
  • (2018)Simulation optimization for planning product transitions in semiconductor manufacturing facilitiesProceedings of the 2018 Winter Simulation Conference10.5555/3320516.3320928(3470-3481)Online publication date: 9-Dec-2018
  • (2017)Towards a new simulation testbed for semiconductor manufacturingProceedings of the 2017 Winter Simulation Conference10.5555/3242181.3242495(1-12)Online publication date: 3-Dec-2017
  1. A full factory transient simulation model for the analysis of expected performance in a transition period

    Recommendations

    Comments

    Information & Contributors

    Information

    Published In

    cover image ACM Conferences
    WSC '06: Proceedings of the 38th conference on Winter simulation
    December 2006
    2429 pages
    ISBN:1424405017

    Sponsors

    • IIE: Institute of Industrial Engineers
    • ASA: American Statistical Association
    • IEICE ESS: Institute of Electronics, Information and Communication Engineers, Engineering Sciences Society
    • IEEE-CS\DATC: The IEEE Computer Society
    • SIGSIM: ACM Special Interest Group on Simulation and Modeling
    • NIST: National Institute of Standards and Technology
    • (SCS): The Society for Modeling and Simulation International
    • INFORMS-CS: Institute for Operations Research and the Management Sciences-College on Simulation

    Publisher

    Winter Simulation Conference

    Publication History

    Published: 03 December 2006

    Check for updates

    Qualifiers

    • Article

    Conference

    WSC06
    Sponsor:
    • IIE
    • ASA
    • IEICE ESS
    • IEEE-CS\DATC
    • SIGSIM
    • NIST
    • (SCS)
    • INFORMS-CS
    WSC06: Winter Simulation Conference 2006
    December 3 - 6, 2006
    California, Monterey

    Acceptance Rates

    WSC '06 Paper Acceptance Rate 177 of 252 submissions, 70%;
    Overall Acceptance Rate 3,413 of 5,075 submissions, 67%

    Contributors

    Other Metrics

    Bibliometrics & Citations

    Bibliometrics

    Article Metrics

    • Downloads (Last 12 months)0
    • Downloads (Last 6 weeks)0
    Reflects downloads up to 07 Mar 2025

    Other Metrics

    Citations

    Cited By

    View all
    • (2018)Simulation optimization for planning product transitions in semiconductor manufacturing facilitiesProceedings of the 2018 Winter Simulation Conference10.5555/3320516.3320928(3470-3481)Online publication date: 9-Dec-2018
    • (2017)Towards a new simulation testbed for semiconductor manufacturingProceedings of the 2017 Winter Simulation Conference10.5555/3242181.3242495(1-12)Online publication date: 3-Dec-2017

    View Options

    Login options

    View options

    PDF

    View or Download as a PDF file.

    PDF

    eReader

    View online with eReader.

    eReader

    Figures

    Tables

    Media

    Share

    Share

    Share this Publication link

    Share on social media