skip to main content
10.1145/268437.268619acmconferencesArticle/Chapter ViewAbstractPublication PageswscConference Proceedingsconference-collections
Article
Free Access

Using simulation to schedule manufacturing resources

Published:01 December 1997Publication History
First page image

References

  1. Drake, G., and J. Smith. 1996. Simulation System for Real-time Planning, Scheduling, and Control, Proceedings of the 1996 Winter Simulation Conference, Ed. Charnes, J. M., Morrice, D. M., Brunner, D. T., and Swain, J. J., San Diego, CA, December, 1083- 1090. IEEE, Piscataway, New Jersey. Google ScholarGoogle ScholarDigital LibraryDigital Library
  2. Flower, M., and M. Cheselka. 1994. The AMP+AKZO Company's Simulation Based Finite Capacity Scheduling System, Proceedings of the 1994 Winter Simulation Conference, Ed. Tew, J. D., Manivannan, S., Sadowski, D. A., and Seila, A. F., Lake Buena Vista, FL, December, 1013-1019. IEEE, Piscataway, New Jersey. Google ScholarGoogle ScholarDigital LibraryDigital Library
  3. Kunnathur, A., P. Sundararaghavan, and S. Sampath. 1996. Dynamic Rescheduling of a Job Shop: A Simulation Study, Proceedings of the 1996 Winter Simulation Conference, Ed. Chames, J. M., Morrice, D. M., Brunner, D. T., and Swain J. J., San Diego, CA, December, 1091-1098. IEEE, Piscataway, New Jersey. Google ScholarGoogle ScholarDigital LibraryDigital Library
  4. Ohno, T. 1988.Toyoto Production System, Productivity Press, Portland OR.Google ScholarGoogle Scholar
  5. Schroer, B., P. Farrington, J. Swain, and D. Utley. 1996. A Generic Simulator for Modeling Manufacturing Modules, Proceedings of the 1996 Winter Simulation Conference, Ed. Charnes, J. M., Morrice, D. M., Brunner, D. T., and Swain J. J., San Diego, CA, December, 1155- 1160. IEEE, Piscataway, New Jersey. Google ScholarGoogle ScholarDigital LibraryDigital Library
  6. Stewart, S., M. Adams, and B. Schroer. 1997. QUICK STEP Continuous Process Improvement Handbook, University of Alabama in Huntsville.Google ScholarGoogle Scholar
  7. Thompson, M. 1993. Simulation Based Capacity Planning and Scheduling with AutoSched, Proceedings of the 1993 Winter Simulation Conference, Ed. Evans, G. W., Mollaghasemi, M., Russell, E. C., and Biles, W. E., Los Angeles, CA, 255-262. IEEE, Piscataway, New Jersey. Google ScholarGoogle ScholarDigital LibraryDigital Library

Index Terms

  1. Using simulation to schedule manufacturing resources

      Recommendations

      Comments

      Login options

      Check if you have access through your login credentials or your institution to get full access on this article.

      Sign in
      • Published in

        cover image ACM Conferences
        WSC '97: Proceedings of the 29th conference on Winter simulation
        December 1997
        1452 pages
        ISBN:078034278X

        Publisher

        IEEE Computer Society

        United States

        Publication History

        • Published: 1 December 1997

        Permissions

        Request permissions about this article.

        Request Permissions

        Check for updates

        Qualifiers

        • Article

        Acceptance Rates

        WSC '97 Paper Acceptance Rate121of191submissions,63%Overall Acceptance Rate3,413of5,075submissions,67%

      PDF Format

      View or Download as a PDF file.

      PDF

      eReader

      View online with eReader.

      eReader