- 1.p3I Computer Timing and Sizing Analysis Report, 29 March 1991. Completed under Contract Number F19628--87-C--0035, ABCCC III p3I Study and Proposal Activity.Google Scholar
- 2.Copyright 1987, Index Technology Corporation, One Main Street, Cambridge, OH 02142.Google Scholar
- 3.Copyright 1991, Unisys Defense Systems Incorporated, P.O. Box 64525, St. Paul, MN 55164-0525.Google Scholar
- 4.Copyright 1988, CACI Products Company, 3344 North Torrey Pines Court, La Jolla, CA 92037.Google Scholar
Index Terms
- Airborne Battlefield Command and Control Center (ABCCC) III capacity study
Recommendations
Emulating the battlefield
High-technology training of US military personnel, which demonstrated its value in the Persian Gulf War, is described. The two largest training facilities, the Army's National Training Center (NTC) at Fort Irwin, California and the Air Force's Fighter ...
A BDOTI Logical Framework of Airborne Command Control System
ISDA '06: Proceedings of the Sixth International Conference on Intelligent Systems Design and Applications - Volume 02In order to enhance the decision capability of airborne command control system (ACCS) in team cooperative air combat under the dynamically changing, uncertain, complex, and hostile air combat environment, we try to apply the agent technology in air ...
A Survey of UAS Technologies for Command, Control, and Communication (C3)
The integration of unmanned aircraft systems (UAS) into the National Airspace System (NAS) presents many challenges including airworthiness certification. As an alternative to the time consuming process of modifying the Federal Aviation Regulations (...
Comments